As Canada’s first elevated park, it is already an ambitious undertaking. However, at a ceremony held Thursday (Nov. 22) at the CASO station, a bold new step forward in the design of the St. Thomas Elevated Park was unveiled. An enhanced vision that could see the entire length of the Michigan Central Railway bridge open to the public next summer.
This week’s event formalized a $100,000 investment by Doug Tarry Homes Ltd., along with a commitment to reach out to the region’s business community with a Doug Tarry Challenge, a fundraising campaign by the St. Thomas homebuilder.
The Doug Tarry Homes End-To-End Challenge has a goal of raising $500,000, which is enough to construct and install the remaining railings and decks required to span the entire bridge, end to end.
“The generous donation by Doug Tarry Homes gave us a unique opportunity to rethink our original plans and set a more ambitious timetable for opening,” says Matt Janes, vice-president of the On Track St. Thomas board of directors and a co-chair of the Doug Tarry Challenge.