Ontario plans to move ahead with its plan to build more modular homes including on government surplus lands.
That was the message from Elgin-Middlesex-London MPP and Associate Minister of Housing in the province’s effort to cut red tape when it comes to increasing the housing supply.
We talked with Flack shortly after the media release went out to delve deeper into the concept of modular homes and their role in the future.
He advised a housing forum was held in Toronto last November where various housing stakeholders got together for a day to identify deliverables needed to speed up homebuilding in the province.
Among those attending was St. Thomas homebuilder Doug Tarry.
“And one of the pieces is modular or factory-built homes and so we’ve been working on getting this market sounding out.
“There are all types of modular homebuilders in Ontario. Big scale ones down to smaller ones.”
Tag Archives: Doug Tarry
From hospital to housing, the re-purposing of the former psychiatric facility in Central Elgin
A pilot program embedded in the provincial budget rolled out Tuesday (March 26) is going to have a direct impact on Central Elgin and Elgin county.
Elgin-Middlesex-London MPP Rob Flack explains what is behind the Site Preparation Pilot Program.
“What I’m really excited about is the province has set aside close to $100 million over three years through what is called the Site Preparation Pilot Program.
“It is to re-purpose surplus sites. And those sites include the former St. Thomas Psychiatric Hospital.
“So, we’re getting ready to develop that and put houses in and roofs over people’s heads.”
Other than serving as the backdrop for the odd movie, the former psych hospital has sat empty for years.
Opened in 1939, the psychiatric hospital was replaced in 2013 by the Southwest Centre for Forensic Mental Health located immediately to the north.
Rapid development and expansion prove Element 5 is not out of its element after locating in St. Thomas
With little in the way of fanfare, Element 5 has become a significant regional success story less than four years after constructing its $50 million plant on 40 acres of land on Dennis Road in the city’s north end.
Even more impressive is the fact the company itself has been in existence for less than a decade.
It was founded in 2015 when it purchased a small cross-laminated timber (CLT)manufacturing company in Ripon, Quebec and began production.
Its St. Thomas facility, completed in 2020, is the most highly automated, state-of-the-art mass timber plant in North America.
It can annually produce 45,000 cubic metres of CLT and 5,000 cubic metres of glulam (glued-laminated timber).
A second shift was added in 2021 and last year, expansion of the existing plant began.
‘Always leave the campsite better than you found it’ – St. Thomas developer Doug Tarry on his purchase of downtown railway lands
Proposed residential development on land currently owned by the Elgin County Railway Museum is an opportunity to revitalize that portion of downtown St. Thomas, stresses Doug Tarry.
The St. Thomas developer made that observation almost three years ago, and this past Tuesday (Feb. 20) city council unanimously agreed to declare certain parcels of land that partially comprise Jonas Park to be declared surplus to the city and those parcels will be sold to Doug Tarry Limited (DTL) for future residential development west of the Elgin Country Railway Museum.
Back in the summer of 2021, Tarry sought to purchase eight acres of railway land immediately west of the museum at $300,000 per acre for a low-rise residential development that would front onto a new street to be created off Ross Street and north of Jonas Street.
The 2024 St. Thomas draft budget comes in at under a 4 per cent increase. Can city council whittle this down further?
City council begins 2024 budget deliberations on Monday (Dec. 4) and the adjusted tax levy comes in at a 3.76 per cent increase.
Keep in mind this is a preliminary look at the budget and in recent years, council has been able to shave up to a percentage point off the initial levy figure.
The proposed levy for the coming year is a shade under $69 million, which is an increase of $4.2 million over this year.
When you factor in $1.7 million in additional growth-related tax, the levy increase drops to $2.4 million, which is a 3.76 per cent increase over this year.
Contractual increases in wages and benefits – $2.5 million – and wages and benefits for new positions next year – $1.4 million – are the biggest contributors to the tax levy increase. Continue reading
The opening of Westlake-Evans Park: The animation of a downtown space
It’s not just a new park for St. Thomas, it’s an active community hub that will provide a much-needed recreational space in the city’s core.
That was the promise back in June 2020 when Andrew Gunn and Maddie King of Andrew Gunn Consulting and young & free press unveiled plans for what would become Westlake-Evans Park.
On Tuesday of this week, the park was officially opened and it lived up to its billing of three years ago.
St. Thomas Mayor Joe Preston praised the park as the result of “incredible collaborative efforts.”
The recreational and cultural hub is located in the city’s core, on the site of the former Colin McGregor Justice Building, giving residents another reason to come downtown, stressed Preston.
“Mostly, it used to be just shopping or services along Talbot Street. Some people came to city hall, and some people were coming to the library, but it was a quick trip in with their family and a quick trip out.
A pair of new St. Thomas schools included in the London District Catholic School Board wish list
In November 2021, London District Catholic School Board trustee Bill Hall observed, “St. Anne’s is bursting with students.”
He made the comments outside St. Anne’s Catholic Elementary School (pictured below) as then Elgin-Middlesex-London MPP Jeff Yurek announced provincial funding for a permanent expansion to the school which hosted more than a dozen portables on its grounds.
This is at a school that opened in 2009.
In June of last year, the school board was successful in its bid to add a couple more portables while the addition is undertaken at St. Annes’s.
At the June 13 city council meeting last year, Coun. Steve Peters observed, “I was at St. Anne’s recently and the number of portables that are already on the site and now adding more, we need a commitment from the provincial government to deal with this inappropriate way for students to be learning.”
Project Tiny Hope in St. Thomas “is the beacon of hope for all in Ontario.” – Associate Minister of Housing Rob Flack
A couple of weeks ago we had a lengthy chat with the province’s new Associate Minister of Housing.
That would be Elgin-Middlesex-London MPP Rob Flack and the interview was prior to Premier Doug Ford pulling a 180 on his plan to open up Greenbelt lands for residential development.
So we arranged with Flack to update us on what led up to the policy reversal and what lies ahead for Flack.
We opened the conversation by asking him to recall what preceeded Ford’s announcement on Sept. 21.
“It was an interesting week,” conceded Flack, “a learning week, a growing week and I think a good week for all people in Ontario.
“As the Premier said, the intention was right. We made a mistake. But you know, I’m a great believer that changing your mind for the right decision is not a vice, it’s a virtue.
St. Thomas area growth triggers major realignment of roads and highways
Preliminary design work is now underway on a massive infrastructure project between St. Thomas and Talbotville.
The undertaking involves three stages: the twinning of Hwy. 3 through St. Thomas to Ron McNeil Line; a new Hwy. 3 alignment that will bypass Talbotville; and the widening of Hwy. 4 from the new Talbotville bypass north to Clinton Line.
No doubt, in part, this is to accommodate traffic into and out of the Volkswagen EV battery plant scheduled to open in 2027 although it is not feasible that this will be fully completed by then.
The Ministry of Transportation has not indicated a tentative completion date at this time.
They have not made anyone available who will go on the record to speak about the work.
On two occasions when approached about further information, they forwarded details of the Hwy. 3 widening near Essex.
